Category: | Cycleway: Other (infrastructure-related) |
Tags: | None |
Date time: | 5.24pm, Thursday 31st July, 2014 |
Time line: | Earlier | Later |
Facing: | Unknown |
Added by: | garydawes |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Hetton-le-Hole |
Wide shared path alongside Cherry Blossom Way in Washington. Massive concrete blocks are to prevent trucks parking
Comments reflect the views of the original submitter only.